“Very often in school renovation projects the initial problem is that of finding sufficient space in a suitable configuration to accommodate the ‘temporary’ class rooms whilst the permanent buildings are under renovation. In this example, the modular classrooms were erected on the car parking areas.”
Requirement
The client required a building to accommodate four classroooms for a period of approximately 12 months whilst major renovation was undertaken to existing elements of the permanent buildings.
Our Solution
The solution was a series of buildings that were accommodated temporarily on what were car parking areas. Each block comprised two classrooms, each with a separate store and a shared cloakroom. The individual blocks were connected by a shared ramp.
Overall Size
Two 4 bay classroom blocks = 240m²
Client
Stamford Schools