A 3-Bay Modular building designed externally to fit in with existing buildings. The requirement was to hire the building for a 2 to 3 year period.
The Requirement
Community drop-in centre as part of a major project.
Our Solution
We proposed and installed a three bay modular building specifically adapted to meet the work that would be required in a hi-tech environment. The building measured 9m wide 9.6m in length. Externally clad in shiplap boarding to match existing neighbouring buildings. Internally the building provided a large community meeting area with adjacent toilet and kitchenette facilities.
Overall Size
3 x 9.6m x 3m = 86m²
Client
Cambridge University